Flood Alert High Water Locations | Radar | Watches and Warnings | Road/Weather Sensors | Driving Safety
The Greater Houston Transportation and Emergency Management Center City of Houston Harris County METRO Texas Department of Transportation
Home | Contact Us | About Houston TranStar Hurricane Information | US-290 Construction Map News Room | Tours

HCTRA Real-Time Construction Schedule
Report generated on Thursday, September 18, 2014

All closures are subject to change due to weather, emergency work, or other events.
HCTRA 24 Hour Dispatch: 281-584-7500
Time Span:

24 Hour Construction Schedule
Thursday, September 18


Real-Time Lane Closure Status:     Active      Inactive

 EAST SAM HOUSTON TOLLWAY
 Southbound at EAST PLAZA (SH-3). TWO LEFT EZTAG LANES. Closed nightly 9:00 PM to 5:00 AM through Friday, September 19. ALL TRAFFIC TO TRAVEL THROUGH RIGHT LANES.  
 
 Southbound from E PLAZA (GRAYSON) to SH-.3. ONE RIGHT LANE. Closed daily from 9:00 AM to 3:00 PM, Thursday, September 18 to Friday, September 19.  
 
 HARDY TOLL ROAD
 Northbound from RILEY FUZZEL to NORTHGATE CROSSING BLVD. ONE LEFT LANE. Closed nightly 9:00 PM to 5:00 AM through Thursday, September 18.  
 
 Southbound from NORTHGATE CROSSING BLVD to RILEY FUZZEL. ONE LEFT LANE. Closed nightly 8:00 PM to 5:00 AM through Friday, September 19.  
 
 NORTH SAM HOUSTON TOLLWAY
 Westbound from SH-249 to WEST RD. THREE LEFT LANES. Closed nightly 10:00 PM to 5:00 AM through Thursday, September 18.  
 
 SOUTH SAM HOUSTON TOLLWAY
 Eastbound at SE PLAZA (WAYSIDE). THREE RIGHT LANES, ALTERNATING. Closed on Thursday, September 18 from noon to 3:00 PM.  
 
 WESTPARK TOLLWAY
 Eastbound Connector Ramp to BELTWAY 8. TOTAL CLOSURE. Closed overnight from 9:00 PM, Thursday, September 18 to 5:00 AM, Friday, September 19.