Reported Road Closures


IH-610 NORTH LOOP Eastbound At IH-10 EAST
Bridge Repair
Exit Ramp, Left Interchange Ramp blocked
Currently Closed
----------
EAST SAM HOUSTON TOLLWAY Northbound At RED BLUFF RD
Construction
Entrance Ramp blocked
Currently Closed
----------
IH-10 EAST Westbound Between SPUR 330/DECKER to SAN JACINTO RIVER
Bridge Repair
2 Mainlanes, Left Shoulder, Entrance Ramp blocked
Currently Closed
----------
IH-10 KATY MANAGED LANE Eastbound Between SH 6 to KIRKWOOD RD
Other
All Mainlanes blocked
Currently Closed
----------
IH-45 Northbound Entrance Ramp from FM-646 in League City
Construction
Total Closure blocked
Active
----------
IH-45 GULF Northbound Connector Ramp to IH-69/SH-288 Southbound
Construction
Total Closure blocked
Active
----------
IH-610 SOUTH LOOP Eastbound and westbound Entrance Ramp from Bellfort
Construction
1 Inside Lane(s) blocked
Active
----------
IH-610 SOUTH LOOP Eastbound and westbound from SCOTT ST to FM-521 ALMEDA RD
Construction
Total Closure blocked
Active
----------
IH-610 SOUTH LOOP Westbound Frontage Road from SH-35/REVEILLE to WOODRIDGE
Construction
Total Closure blocked
Active
----------
IH-610 WEST LOOP Southbound Exit Ramp to FOURNACE PL
Construction
Total Closure blocked
Active
----------
IH-69 SOUTHWEST Northbound Frontage Road from NEWCASTLE DR to WESLAYAN ST
Other
Total Closure blocked
Active
----------
IH-69 SOUTHWEST Northbound Connector Ramp to IH-610 WEST LOOP Northbound & Southbound
Construction
Total Closure blocked
Active
----------
IH-69 SOUTHWEST Northbound Entrance Ramp from CHIMNEY ROCK RD
Construction
Total Closure blocked
Active
----------
IH-69 SOUTHWEST Southbound Frontage Road from IH-610 WEST LOOP to SOUTH RICE
Construction
Total Closure blocked
Active
----------
IH-69 SOUTHWEST Southbound from HILLCROFT AVE to GESSNER RD
Bridge Repair
3 Alternate Lane(s) blocked
Active
----------
US-290 NORTHWEST Eastbound from ELDRIDGE PARKWAY to FM-529
Construction
2 Inside Lane(s) blocked
Active
----------
SH-288 Northbound Connector Ramp to IH-610 SOUTH LOOP
Construction
Total Closure blocked
Active
----------
SH-288 Northbound and southbound from BELLFORT BLVD to HOLLY HALL ST
Construction
Total Closure blocked
Active
----------
Post Oak Blvd Northbound and southbound from I-69 Southwest Freeway to Hidalgo
Construction
1 Alternate Lane(s) blocked
Active
----------