Houston TranStar
Traffic Information


Reported Road Closures

US-59 Eastex Freeway Northbound At SAN JACINTO RIVER
Other
Frontage Road U-turn blocked
Currently Closed
----------
SH-225 Westbound Between SH-146 to STRANG
Pavement Repair
1 Frontage Lane(s) blocked
Currently Closed
----------
WESTPARK TOLLWAY Eastbound At ELDRIDGE
Construction
Entrance Ramp blocked
Currently Closed
----------
WESTPARK TOLLWAY Eastbound Between ELDRIDGE to COOK
Construction
1 Mainlane, Right Shoulder blocked
Currently Closed
----------
IH-10 KATY MANAGED LANE Westbound Between ELDRIDGE PKY to WILCREST DR
Construction
All Mainlanes blocked
Currently Closed
----------
HARDY TOLL ROAD Northbound Between FM-1960 to IH-45 NORTH
Construction
All Mainlanes blocked
Currently Closed
----------
HARDY TOLL ROAD Southbound Between IH-45 NORTH to FM-1960
Construction
All Mainlanes blocked
Currently Closed
----------
EAST SAM HOUSTON TOLLWAY Northbound At W. Lake Houston Pkwy
Construction
Entrance Ramp blocked
Currently Closed
----------
BELTWAY 8-NORTH Eastbound At IH-45 NORTH
Construction
Exit Ramp, Left Interchange Ramp, Right Interchange Ramp blocked
Currently Open
----------
WEST SAM HOUSTON TOLLWAY Northbound At US-290 NORTHWEST
Construction
Exit Ramp, Right Interchange Ramp blocked
Currently Closed
----------
WEST SAM HOUSTON TOLLWAY Southbound At US-290 NORTHWEST
Construction
Exit Ramp, Left Interchange Ramp blocked
Currently Closed
----------
IH-10 KATY Eastbound Frontage Road from BASS STREET to HEIGHTS BLVD
Construction
1 Outside Lane(s) blocked
Active
----------
US-290 NORTHWEST Eastbound from FM-529 to LITTLE YORK RD
Construction
Total Closure blocked
Active
----------
US-290 NORTHWEST Eastbound Connector Ramp to BELTWAY 8-WEST
Construction
Total Closure blocked
Active
----------
US-59 Southbound Exit Ramp to Reading Rd
Construction
Total Closure blocked
Active
----------
US-59 Eastex Freeway Southbound from TIDWELL RD to LAURA KOPPE RD
Bridge Repair
3 Outside Lane(s) blocked
Active
----------
BELTWAY 8-NORTH Northbound and southbound Connector Ramp to US 290 EASTBOUND
Construction
Total Closure blocked
Active
----------
BELTWAY 8-SOUTH Westbound Frontage Road from SH-288 to Kirby Dr
Construction
1 Inside Lane(s) blocked
Active
----------
SH-99 GRAND PARKWAY Northbound at West Rd
Construction
1 Outside Lane(s) blocked
Active
----------
SH-225 Eastbound from BELTWAY 8-EAST to TIDAL RD
Construction
2 Outside Lane(s) blocked
Active
----------
SH-288 Northbound Entrance Ramp from SOUTHMORE BLVD
Construction
Total Closure blocked
Active
----------
MEMORIAL DRIVE Eastbound and westbound from EAST OF GESSNER to STREY
Construction
Total Closure blocked
Active
----------
Yale St Northbound from Center St to Koehler St
Construction
1 Outside Lane(s) blocked
Active
----------
Yale St Northbound and southbound from IH 10 Eastbound Frontage Rd to Koehler St
Construction
Total Closure blocked
Active
----------
 
Traffic Information
Maps
Travel Times
Route Builder New!
Incidents
Construction Closures
Cameras
Home

Copyright © 2016 Houston TranStar
All Rights Reserved