Reported Road Closures


NORTH SAM HOUSTON TOLLWAY Westbound At ANTOINE DR to HOLLISTER RD
Other
1 Mainlane blocked
Currently Closed
----------
IH-10 KATY MANAGED LANE Westbound Between BLALOCK RD/ECHO LN to WILCREST DR
Other
All Mainlanes blocked
Currently Closed
----------
WEST SAM HOUSTON TOLLWAY Northbound At US-290 NORTHWEST
Other
Exit Ramp blocked
Currently Closed
----------
WEST SAM HOUSTON TOLLWAY Southbound At US-290 NORTHWEST
Other
Exit Ramp blocked
Currently Closed
----------
IH-610 WEST LOOP Northbound At POST OAK RD to WOODWAY DR
Construction
2 Mainlanes, Left Shoulder blocked
Currently Closed
----------
NORTH SAM HOUSTON TOLLWAY Eastbound Between BAMMEL NORTH HOUSTON RD to NORTH SAM PLAZA
Construction
1 Mainlane, Left Shoulder blocked
Currently Closed
----------
IH-10 KATY Eastbound Frontage Road from BASS STREET to HEIGHTS BLVD
Construction
1 Outside Lane(s) blocked
Active
----------
IH-45 GULF Southbound Exit Ramp to PIERCE ST
Construction
Total Closure blocked
Active
----------
IH-45 NORTH Southbound Entrance Ramp from ALLEN PARKWAY
Construction
Total Closure blocked
Active
----------
IH-45 NORTH Southbound Entrance Ramp from HOUSTON AVE
Construction
Total Closure blocked
Active
----------
US-290 NORTHWEST Eastbound from MUESCHKE to BARKER CYPRESS RD in Cypress
Construction
2 Alternate Lane(s) blocked
Active
----------
US-290 NORTHWEST Westbound from LITTLE YORK RD to FM-529
Construction
Total Closure blocked
Active
----------
US-290 NORTHWEST Westbound Connector Ramp to BELTWAY 8-WEST
Construction
Total Closure blocked
Active
----------
US-59 Southbound Exit Ramp to Reading Rd
Construction
Total Closure blocked
Active
----------
BELTWAY 8-SOUTH Westbound Frontage Road from SH-288 to Kirby Dr
Construction
1 Inside Lane(s) blocked
Active
----------
BELTWAY 8-WEST Northbound and southbound Connector Ramp to US-290 NORTHWEST
Construction
Total Closure blocked
Active
----------
SH-99 GRAND PARKWAY Northbound at West Rd
Construction
1 Outside Lane(s) blocked
Active
----------
SH-99 GRAND PARKWAY - West Northbound and southbound Connector Ramp to US 290 westbound
Construction
Total Closure blocked
Active
----------
SH-225 Eastbound from BELTWAY 8-EAST to TIDAL RD
Construction
2 Outside Lane(s) blocked
Active
----------
SH-225 Westbound from TIDAL RD to BELTWAY 8-EAST
Construction
Total Closure blocked
Active
----------
SH-288 Northbound from DIXIE DR to WHEELER
Construction
3 Outside Lane(s) blocked
Active
----------
HOUSTON AVENUE Southbound from LUBBOCK to RUSK
Construction
Total Closure blocked
Active
----------
MEMORIAL DRIVE Eastbound and westbound from EAST OF GESSNER to STREY
Construction
Total Closure blocked
Active
----------
SPUR-330 Westbound Connector Ramp to IH-10
Construction
Total Closure blocked
Active
----------
Yale St Northbound from Center St to Koehler St
Construction
1 Outside Lane(s) blocked
Active
----------
Yale St Northbound and southbound from IH 10 Eastbound Frontage Rd to Koehler St
Construction
Total Closure blocked
Active
----------