Reported Road Closures


IH-45 Northbound At SAN JACINTO RIVER
High Water
3 Frontage Lane(s), Frontage Road U-turn blocked
Currently Closed
----------
IH-45 Southbound At SAN JACINTO RIVER
High Water
3 Frontage Lane(s), Frontage Road U-turn blocked
Currently Closed
----------
US-59 EASTEX Northbound At SAN JACINTO RIVER
High Water
Frontage Road U-turn blocked
Currently Closed
----------
US-59 EASTEX Southbound At SAN JACINTO RIVER
High Water
Frontage Road U-turn blocked
Currently Closed
----------
IH-45 NORTH Northbound from ALLEN PARKWAY to HOGAN/CROCKETT ST
Construction
2 Inside Lane(s) blocked
Active
----------
US-290 NORTHWEST Eastbound Frontage Road from BAUER to MASON
Construction
Total Closure blocked
Active
----------
US-290 NORTHWEST Westbound Frontage Road from FAIRFIELD PLACE to BAUER
Construction
Total Closure blocked
Active
----------
BELTWAY 8-SOUTH Northbound and southbound Frontage Road from SH-288 to US 59
Pavement Repair
2 Alternate Lane(s) blocked
Active
----------